Overflow System Pools

Overflow System Pools

 

Internal coatings, handles and non-slip of our overflow system reinforced concrete pools;

are ceramic, porcelain or glass mosaic based. It can be made in all kinds of forms, depths and sizes.

2 years warranty on the material. It requires engine room, balance pool and galleries for filtration. The construction period is approximately 2 to 4 months depending on the size. Although this system is not known much in Europe and America, it is the most applied system in Turkey.

Make your pool in the spring, use it coolly in the summer ...

After your application, the ground survey is made and the area where the pool will be built is checked whether it is suitable for this job. In case of suitability, excavation is done. To prevent the pool bowl from moving and working, lean concrete is thrown. Thus, a clean floor is obtained for the work area. On top of this, raft connections are made using double wicker Ø 12 and Ø 14 base curtains with the radiant connection without cutting them.

Concrete Formwork ...

At this stage, it is important to make the infrastructure that will filter the pool water before the foundation in order to prevent the breakage of the pool bowl and leakage. Base concrete is poured in 30-35 cm thickness by driving the mold. Curtains and pool basin concretes are cast in 25 cm thickness. At the end of the reinforced concrete work, the pool is isolated with water insulation with YKS 306 or equivalent material and a complete water tightness is provided. Then, porcelain or ceramic handles or marble handrails are placed and plastered. At the last stage, Porcelain or ceramic or Glass Mosaic is applied into the pool by using Flex glue and joint gaps. Boiler room, balance tanks and spillways are covered with tiles.

The ladder is assembled. The work is delivered by assembling the boiler room (filtration systems). Our pool is under our warranty for 2 years.

 

Excavation and Ground Iron

Excavation and Ground Iron

Installation of Filtration Pipes

Installation of Filtration Pipes

Mold Work

Mold Work

Concrete Work

Concrete Work

Concrete Detail

Concrete Detail

Shaping Rough Construction

Shaping Rough Construction

Rough construction

Rough construction

Veee Pool

Veee Pool

Dolphin 2001 Automatic pool cleaner

Dolphin 2001 Automatic pool cleaner

Dolphin 3001 Automatic pool cleaner

Dolphin 3001 Automatic pool cleaner

Dolphin Dynamic Pro Automatic Pool Cleaner

Dolphin Dynamic Pro Automatic Pool Cleaner

GW Dip Cleaning Broom

GW Dip Cleaning Broom

Fiberpool Pumping

Fiberpool Pumping

General Water Pumps

General Water Pumps

GW 4-step pool ladder (classic)

GW 4-step pool ladder (classic)

GW 4-step pool ladder (Mixto)

GW 4-step pool ladder (Mixto)

GW Weir Grates Corner Elements

GW Weir Grates Corner Elements

GW Weir Grates

GW Weir Grates

GW Special Lighting Fixtures

GW Special Lighting Fixtures

GW Special Lighting Fixtures

GW Special Lighting Fixtures

GW Special Lighting Fixtures

GW Special Lighting Fixtures

GW Electricity Board

GW Electricity Board

GW Sheet Metal Transformers

GW Sheet Metal Transformers

General Water Transformers

General Water Transformers

GW Feeding Nozzles

GW Feeding Nozzles

GW Sand Filter

GW Sand Filter

GW Sand Filter

GW Sand Filter

Automatic Chlorinator

Automatic Chlorinator

Lovibond Pool Test Kits

Lovibond Pool Test Kits

Lovibond Pool Test Kits

Lovibond Pool Test Kits

Lovibond Pool Test Kits

Lovibond Pool Test Kits

Poolmaster Pool Test Kits

Poolmaster Pool Test Kits

Praher Multi Way Valve

Praher Multi Way Valve

Praher Multi Way Valve

Praher Multi Way Valve

GW skate park

GW skate park