How can Aquapark Costing be done?

How can Aquapark Costing be done?


How can Aquapark Costing be done?

In addition to the construction of an aquapark, pools, slides, wastewater in all infrastructure, clean water lines, electrical wiring, superstructure, entrance dressing building, extra toilet, sales shops, executive offices manufacturing, terraces, green areas and irrigation systems, fencing with grass fence, cafeteria, restaurant manufacturing, electronic entrance and rapid sales systems installation, camera monitoring, audio announcement systems installation, generator, transformer regulator, field lighting installations are actually the production of entertainment cities.

714 different item materials can be applied to their places by drawing 25 or 90 different detailed projects, depending on the size of the project.

From this point of view, it is known that when the bids given by different companies for their own fields are collected, they face the risk of not meeting the costs of the customers as there may still be a small but large number of work items that are not priced. Ulusal Havuz can fill this gap with detailed, visual, brand, power etc. technical information created by bringing all business items together and provide an important service in determining the financing needs of the customer by performing a healthy cost analysis from the beginning.